- 2D Architectural Layout
- 3D Visualisation
- 2D Structural Design
- Steel: A-One Gold / Sunvik / Same range product
- Aggregates: 20mm & 40mm
- Blocks: Double Press Solid Bricks, 6inc / 4inc
- Wall: External: 6inc brick work, Internal: 4inc brick work
- Cement: ACC / Birla / Same range product
- Cement Grade: 43 & 53
- M Sand/ P Sand: First Grade double wash
- RCC Design Mix: As per structural design standard
- Waterproofing: Dr.Fixit
- Ceiling Height: 10 feet
- Ceramic Wall Tiles: 2 feet above kitchen slab – Budget: 50rs/sft
- Main Sink Faucet: 1500 rs
- Extended Swinging Spout Faucet (1 no’s): ISI Product – Budget: 1500rs
- Any Other Faucet & Accessories: ISI Product – Budget: 1500rs
- Kitchen Sink: Stainless Steel waste coupling Sink (1no’s) ISI Product, Budget: 4000rs
- Kitchen Granite: 40 mm thick: Budget: 130rs/sft
- Bathroom Ceramic Wall Tiles upto 7ft high – budget: 45rs per sft
- Sanitary ware Bathroom Accessories & CP fittings: EWC, Health Faucet, Wash Basin with accessories, 2 in 1 wall mixer
- Brand: ISI Product
- Budget: 35,000 rs for 1000 sf
- Bathroom doors: Waterproof flush doors – budget: 150 rs per sft
- CPVC Pipe: Astral
Main Door:
- TFlush Door with Veneer and Red Sal wood Frame
- Frame Size: 5inc by 3inc
- Size: 4ft x 7ft
- Budget: 15,000 INR including door and frame with fixtures and fittings
Internal Doors:
- Membrane Doors / Flush Door
- Door frame: Salwood
- Door frame: Salwood
- Budget: 9000rs including fixtures and fittings
- Aluminum 3 track windows with mesh and sliding shutters
- MS grills with paint
- Budget: 350rs/sft
- Aluminum 3 track windows with mesh and sliding shutters
- Exterior Paint: Asian Primer + Ace Exterior Emulsion
- Living, Dining, Rooms, Kitchen Flooring: Tiles: Budget: 55rs/sft
- Balcony and Open Areas Flooring: Anti-skid tiles: Budget: 50rs/sft
- Staircase Flooring: Granite: Budget: 80rs/sft
- Parking Tiles: Anti-skid tiles: Budget: 50rs/sft
- Wires: Fireproof wires by Finolex or same range products
- Switches & Sockets: Anchor Roma
- Overhead Tank: Sintex: 1000 ltrs
- Underground Sump: 8,000 Ltrs
- Staircase/Balcony Railing upto 3ft height: MS Railing: 150rs/sft
- Parapet wall: 3ft height
- Window grills: Basic MS Grill with enamel paint: 100 / sft
- Gas point and pipeline at staircase
- Gate: Premium MS Steel Budget: 400 /sft, size: 5ft height
- Permission and Approvals
- OC
- BESCOM Connection, meter, panel work
- Water Supply for construction
- Temporary Electricity connection
- FAN, Geyser, Bulb